Industry solutions · Civil & Earthmoving

Civil and Earthmoving Reporting That Tracks Cost Against Ground Truth

Plant utilisation, cut and fill progress, wet weather days, and cost-to-complete in one weekly pack — built from the dockets, timesheets, and machine data you already collect.

  • Plant hire and internal charge rates reconciled against actual hours
  • Progress claims tied to surveyed quantities, not estimates
  • Weather and standby time visible against the programme

Weekly pack

Civil weekly pack

Fake data
Plant utilisation78%Plant Manager
Quantities this week4,120 m³Surveyor
Standby hours36Site Supervisor
Cost-to-complete$1.4mCommercial
Unapproved variations7Project Manager

Reporting areas

What civil contractors report on first

Each one starts as a single trusted number with a named owner, then earns its place in the weekly review.

Plant utilisation and standby

Machine hours against availability, with standby and wet weather separated so idle plant is a decision rather than a line in the cost report.

Quantities and progress claims

Surveyed volumes against programme and against claimed quantities, so the claim and the ground agree before the certifier looks at it.

Cost-to-complete

Committed and incurred cost forecast to final position, updated as dockets and invoices land rather than at month end.

Subcontractor and hire spend

Wet and dry hire, subcontract claims, and day-labour tracked against the budget line they were quoted against.

Crew and equipment allocation

Who and what is on which job this week, and where the double-bookings and gaps are before the schedule locks.

Safety and compliance actions

Prestarts, incidents, and corrective actions with owner and due date, alongside the production numbers rather than in a separate system.

Systems we pull from

Built from the systems already on site

We build on what you already own. No new platform to buy, and each system stays the record of truth for its own work.

Send us your report pack →
Docket and delivery records
Timesheet and payroll systems
Plant telematics and machine hours
Survey and quantity data
Accounting and job costing — Xero, MYOB, or ERP
Prestart, incident, and safety registers

FAQ support

Frequently asked questions

Clear answers on timeline, investment, and delivery scope.

We run dockets on paper. Can you still build the reporting?

Yes. Paper dockets are common on civil sites and the first sprint works around them rather than waiting for a digital rollout. Usually a single daily entry captures the docket totals, and the reporting proves its value before anyone is asked to change what happens in the ute. If digitising dockets later makes sense, the reporting carries across unchanged.

Can you use plant telematics, or do we need to enter machine hours manually?

Both work. Telematics feeds from most major machine brands can be exported and joined to the job, which removes manual entry and makes utilisation reporting far more accurate. Where telematics is not fitted or not accessible, operator-recorded hours are used. Mixing the two across a fleet is normal and the reporting handles it.

How do you handle wet weather and standby in the cost reporting?

Separately from productive hours, always. Blending standby into utilisation makes a fleet look busier than it is and hides the cost of waiting. Wet weather days are tracked against the programme as well as the cost, because they usually drive an extension-of-time claim that needs the same evidence.

Does this replace our job costing system?

No. The reporting reads from whatever you use for job costing and does not become a place to enter costs. What it usually replaces is the spreadsheet a project manager or commercial manager rebuilds each week to make the job costing readable.

Can progress claims be reconciled against surveyed quantities?

That is one of the most requested views. Claimed quantities against surveyed quantities against programme, on one page, makes over- and under-claiming visible early. It depends on the survey data being available in a structured form — which it usually is, even when it currently only exists as a series of exports.

How long does the first civil reporting pack take?

One to two weeks for a single view such as plant utilisation or cost-to-complete on one job. Three to six weeks for the full weekly pack across the portfolio. The variable is usually how consistent job and cost coding is between the accounting system and the site paperwork.

Related sectors

Where to go next

Send one job's dockets and cost report.

The Reporting Friction Audit starts from a real job you are running now and returns a friction map plus a 30-day fix path before any dashboard is scoped.

Book the Reporting Friction Audit →