Did we hit target, and where did we lose it?
Actual against target by line and shift, with the gap attributed to downtime, rate loss, or quality loss rather than left as a single variance number.
Throughput, downtime, yield, and OEE against target — by line, by shift, and by crew
Most plants already collect enough data to explain a bad week. It just lives in a SCADA historian, a shift log, a maintenance system, and a spreadsheet that the production manager assembles on Monday morning. We build the dashboard that joins them, so the production meeting starts with the causes rather than the collection.
Service command deck
Production Performance Dashboards for Plants That Run on Shift Data
Insights changing live
Starter range
$400-$1k
Production performance
A production dashboard is only useful if it survives contact with the shift meeting. This is the shape we build: the number, the exception that explains it, the person who owns it, and what changes before the next run.
Book the Reporting Friction AuditWeekly operator pack
Throughput vs target
94%
+3 pts
Unplanned downtime
11.4h
2 causes
First-pass yield
97.1%
stable
Shift data entry
3.2h
removed / week
Line 2 changeover
Due this weekOwner: Production Supervisor
Trial the revised changeover sequence on night shift
Packaging downtime
At riskOwner: Maintenance Lead
Confirm root cause on the recurring infeed stoppage
Scrap on grade change
In progressOwner: Quality Coordinator
Review the hold-and-release rule with the shift leads
Production reviews lose most of their time to reconstructing what happened. These views remove that step.
Actual against target by line and shift, with the gap attributed to downtime, rate loss, or quality loss rather than left as a single variance number.
Downtime ranked by cause and by cost, not by frequency alone. The long tail of short stops often outweighs the one incident everybody remembers.
The same performance data cut three ways. Most persistent production problems only become obvious when you can hold two of those constant.
Scrap, rework, and off-spec by stage and by reason, tied back to the run and the crew, so quality actions land where the loss occurs.
Availability, performance, and quality shown separately. A single OEE figure hides which of the three moved, which is the only part that tells you what to do.
Handover notes, holds, and open issues attached to the shift record rather than living in a paper book or a group chat.
Plant data is rarely tidy and almost never in one place. The first sprint works with what is already captured, including the parts that are still manual.
No system replacement is required to start. The first sprint works from the access you already have — exports, extracts, or a read-only connection — and integration is scoped only once the reporting has proved worth automating.
Scope, outcomes, and pricing
Clear outcomes, practical scope, and pricing you can plan around.
Causes, not just totals
Downtime and loss are attributed to a cause and a line, so the review discusses fixes instead of establishing facts.
Shift data entry reduced
The manual daily assembly step is replaced by a scheduled refresh, and supervisors record exceptions rather than retyping numbers.
Comparable shifts
The same definitions apply across crews and lines, which is what makes shift-to-shift comparison fair enough to act on.
Actions that carry over
Trials, root-cause investigations, and process changes stay visible across weeks instead of resetting each Monday.
Indicative ranges help planning. Final pricing is based on complexity, integrations, and delivery pace.
Starter
$400-$1k
1-2 weeks
One line or one question — usually downtime by cause — built from existing exports.
Scope this sprintBusiness Core
$1k-$5k
3-6 weeks
Plant-wide throughput, downtime, yield, and OEE with the daily pack and weekly review built in.
Scope this sprintConnected
$5k+
6 weeks+
Automated feed from the historian or MES, governed roles, and a maintained model across sites.
Scope this sprintDelivery model
Sprint first
One line proved before plant-wide rollout is scoped.
Plant access
Read-only
Reporting reads from exports or a read-only connection. No control-system changes.
Built with supervisors
Not around them
Reason codes and targets are agreed with the people who record them, or the data stays wrong.
Closest proof routes
FAQ support
Clear answers on timeline, investment, and delivery scope.
No, and we usually would not start there. Most first sprints run from historian exports, MES reports, or the spreadsheets supervisors already maintain. Reporting is read-only by nature, and a direct historian connection is scoped later once the views have proved worth automating. Nothing we build writes to a control system.
It is the most common starting condition and it is part of the work, not a prerequisite. The first sprint includes cleaning and grouping the reason codes with the supervisors who record them. Reporting built on codes nobody trusts will be ignored, so this step happens before the dashboard, not after.
Yes, provided the underlying data exists — run time, planned time, actual output, target rate, and reject counts. The definition workshop is where the arguments get settled: what counts as planned downtime, whether changeover is availability or performance loss, and which rate is the target. Those choices are then published on the dashboard so the number stays comparable.
Yes. Multi-line and multi-site reporting is common, and it is where the comparability work pays off most. The constraint is usually that different sites record downtime differently — so the taxonomy has to be agreed once, centrally, before cross-site comparison means anything.
Two options, and the choice is usually operational rather than technical. Either the paper record is replaced by a simple structured entry form that feeds the dashboard, or the paper stays and a single daily entry captures the exceptions. We would rather start with the second and change it later than stall the reporting on a data-capture project.
One to two weeks for a single line or a single question in the Starter range. Three to six weeks for plant-wide throughput, downtime, yield, and OEE with the daily pack — the variable is almost always how quickly reason codes and target rates get agreed, not the build.
Most sprints start in one area and extend into the next once the weekly rhythm holds.
Where this reporting has been built before, and the industries it fits most directly.
The Reporting Friction Audit starts from the shift log, downtime report, or production spreadsheet you use today, and returns a friction map plus a 30-day fix path before any dashboard is scoped.
No commitment required. We will help you pick the right first sprint before any build commitment.